Factory Price Iec 62196 Type 2 - Wholesale IP55 AC 380V 22KW 32A commercial ev charger with OCPP 1.6 – Hengyi
Factory Price Iec 62196 Type 2 - Wholesale IP55 AC 380V 22KW 32A commercial ev charger with OCPP 1.6 – Hengyi Detail:
Product Detail
Three phase 22KW 32A 380V (± 10%), 5M (16.4 FT) ev charging string as standard, casing colours available in black and white, customised casing colours and charging string lengths available for larger orders.
Compatible with IEC 62196 Type 2 European standard, GB/T.
Designed with safety in mind, there are protection mechanisms forover-current,over-voltage andover-temperature problems, with a aggregate of 8 safety measures to cover the device and the auto during charging. The casing is made of ABS PC injection moulding and has a fire standing of UL94V_0.
The factors of the main board are handed in well- known manufacturers, with dependable quality. The main control MCU is characterised by low power consumption, high performance and high integration. The operating temperature covers-40 °C-85 °C, which can meet the harsh working terrain.
The EV charging string is made of high chastity bobby with excellent electrical conductivity, slow heating of the captain during high current charging and long operating time. The external cover is made of high quality TPU, which is resistant to erosion and low temperatures, so that the charging string won’t harden due to low temperatures and help the device from working duly.
Easy to install, it’s recommended to use hard wiring for the input power string. The installation height of the charging device is about1.5 M from the ground. a hook is included to store the ev charging string.
The package size is 45 * 37 * 20 cm and comes with wall mounting accessories as standard, if you need a stage you’ll need to buy an fresh one. Shipping terms are EXW, FOB,etc.
Please communicate us for further information, thank you!
Specifications
Parameter |
Product model |
Dark house Ⅰ Series |
Structure |
Size(mm) |
350(H)*240(W)*95(D)mm |
Installation |
Wall-mounted Type / Floor-standing Type Installation |
|
Charging cable |
5M(16.4FT) standard, 7.5m / 10m or other size customizable |
|
Weight |
8.0kg (Including charging gun) |
|
Electrical Specifications |
Input voltage |
AC220V±20% / AC380V±10% |
Frequency rating |
45~65HZ |
|
Power rating |
7KW /11KW /22KW Optional |
|
Measuring accuracy |
1.0 grade |
|
Output voltage |
7KW:AC 220V±20% 11/22KW :AC 380V±10% |
|
Output current |
7KW:32A 11KW:3*16A 22KW:3*32A |
|
Measurement accuracy |
OBM 1.0 |
|
Function |
Indicator light |
Y |
4.3 inch display screen |
Optional |
|
Communication interface |
WIFI/4G/OCPP1.6/LAN Optional |
|
Operating conditions |
Working temperature |
-40~+65℃ |
Relative humidity permission |
5%~95%(non-condensation) |
|
Maximum altitude permission |
≤3000m |
|
IP grade |
≥IP55 |
|
Cooling way |
Natural cooling |
|
Applicable ambient |
Indoor/outdoor |
|
ECT |
UV resistance |
|
MTBF |
≥100000H |
Product detail pictures:
Related Product Guide:
Our corporation puts emphasis about the administration, the introduction of talented staff, plus the construction of team building, attempting hard to improve the quality and liability consciousness of team members. Our organization successfully attained IS9001 Certification and European CE Certification of Factory Price Iec 62196 Type 2 - Wholesale IP55 AC 380V 22KW 32A commercial ev charger with OCPP 1.6 – Hengyi, The product will supply to all over the world, such as: Palestine, Gambia, Nepal, Corporate goal: Customers' satisfaction is our goal, and sincerely hope to establish long-terms stable cooperative relations with customers to jointly develop the market. Building brilliant tomorrow together!Our company regards reasonable prices, efficient production time and good after-sales service as our tenet. We hope to cooperate with more customers for mutual development and benefits. We welcome potential buyers to contact us.
By Myra from Philippines - 2017.02.14 13:19
Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
By Darlene from Portland - 2017.07.07 13:00